Login

Deliverables
DOMEO project public delivrables.
Documents
D1.1 : Interviews methodology report
This document presents the methodology defined and used by the consortium for realizing user’s interviews.
D2.2 : Generic tests description file and methodology
This report is giving a frame to organise and describe tests with users as part of the iterative approach implemented in DOMEO Project.
D2.1 : Field tests and deployment methodology report
This report is giving a methodological frame and common language for a realistic evaluation of the products of the project with users.
D1.3 : Recommendations for service implementation
This document contains guidelines for robuMATE/Kompaï implementation, as a set of recommendations for WP7. It gives the methodology to install the robot and follow up operations, including pre-requisites.
D6.2 : Telecommunication connections integration report
This document introduces how equipment or components are required to be integrated together with peripheral sub-systems. It provides information concerning equipment physical connection and configuration to meet the DOMEO requirements.
D8.1 and D8.2 : Dissemination Plan and Actions
This document concerns the plan for using and disseminating the knowledge in the DOMEO project. This document follows the life of the project and is completed month after month. Regular updates are made in accordance with new publications or new interesting results coming from robot development or evaluation. To make things clearer, we merged D8.1 (external communication) and D8.2 (dissemination plan) into a single document.
D1.2 : Interviews results report
This document on the local implementation of the Domeo interviews in Austria, in Hungary and in France presents the summary of the methodology (see detailed description in Deliverable 1.1), the findings and observations of the Domeo project’s interviews with end users, family carers and professional carers.
D4.1 : Basic Functions Lab Test Report
Kompaï, RobuMATE, WP4, Laboratory tests
D6.1 : Telecommunication overall system description
This document provides a description of the DOMEO network facilities and technologiesThis document
D1.4 : Preliminary Economic Model
This document presents the preliminary business plan of the DOMEO project. It will be followed by D1.5 by the end of the project.
D4.0 : Description of robuMATE
This document is accompanying the delivery of robuMATE prototypes, also called Kompaï (trademark for further commercial deployment)
D7.1 : Deployment report : investigation plan of the field tests in patient's home
This deliverable describes the criteria of the houses/flats where the field test can take place, the inclusion/exclusion criteria of the subjects, the procedure of the field test and the evaluation methods.
D5.1 : Description of robuMASTER prototype
This document is a description of the robuMASTER prototype, as defined in the new DoW. robuMASTER is now a piece of software included in the robot, and not an independent device. This first release will be followed by a final version at the end of the project.
D3.1 : robuWALKER laboratory tests and evaluation
The first robuWALKER has been put for two weeks in the old person’s home substitute. Then first trials were done in the CHUT apartment. At this stage, the prototype has no sensors and brings assistance to stand up, walk and sit with buttons only.
D6.3 : Data transmission validation and performance report
Purpose of Deliverable D6.3 “Data transmission validation and performances” is to present the results of the technical tests made in the frame of Workpackage 6 to characterize the possible implemented telecommunication networks of the DOMEO system. It is the thirdpard of Workpackage 6 technical activity whose aim was to describe, then to set-up and finally to validate the DOMEO network architecture.